DTi is a professional chemical testing organization around you!

0755-32936716

Hotline:13923722641

News

Real-time dynamic update of company/industry news

Position:Home > News > question

What are the general steps in the EU RoHS testing process for water heaters?

Date:2024-09-27 10:21:30 Classification :【question】 Visits:
Hazardous substances mainly restricted by EU RoHS testing include lead (Pb), mercury (Hg), cadmium (Cd), hexavalent chromium (Cr6+), polybrominated biphenyls (PBBs) and polybrominated diphenyl ethers (PBDEs), as well as certain orthobenzenes Diformates (DEHP, BBP, DBP, DIBP). The content of these substances must not exceed specified limits. The EU RoHS testing process usually includes the following steps:

1. Submit an application: The manufacturer or importer submits a RoHS testing application to the testing agency.

2. Quotation settlement: The testing agency provides a quotation based on the submitted application, and the customer makes payment after agreeing to the quotation.

3. Mail samples: Customers mail water heater samples to the testing agency.

4. Sample testing: The testing agency conducts chemical analysis on the samples to determine whether they contain lead (Pb), mercury (Hg), cadmium (Cd), hexavalent chromium (Cr6+), polybrominated biphenyls (PBBs) and polybrominated diphenyl ethers ( PBDEs) and other harmful substances, and determine whether the content of these substances exceeds the prescribed limit.

5. Report and certificate: If the product complies with RoHS standards, the testing agency will issue a conformity report and certificate.

Materials required may include:

1. Product samples: A certain number of water heater samples are required for testing.

2. Technical documents: including product circuit diagram, material list, production process, etc.

3. Application form: Fill in the RoHS testing application form.

4. Product description: Provide a detailed description of the product, including material composition, functions, etc.

5. Other materials that may be required: Other relevant documents may be required according to the requirements of the testing agency.

Please note that the specific process and required materials may vary depending on the requirements of the testing agency.

Copyright © Shenzhen DTi Technology Testing Co., Ltd. All Rights Reserved Record number: 粤ICP备18006753号-2  Shen Gongwang Security: 44030602006947
13923722641

报价二维码

报价二维码