DTi is a professional chemical testing organization around you!

0755-32936716

Hotline:13923722641

News

Real-time dynamic update of company/industry news

Position:Home > News > question

Amazon Ocean Ball CPC Test Report Processing

Date:2026-01-29 09:30:55 Classification :【question】 Visits:
A detailed guide to obtaining a CPC (Content Product Safety) test report for Amazon ocean ball pits, covering key information such as procedures, standards, and precautions.

I. Core Requirements for a CPC Test Report

1. Applicable Product Scope

Ocean ball pits are children's toys and must comply with the requirements of US ASTM F963-17 (Toy Safety Standard) and CPSIA (Consumer Product Safety Improvement Act), including:

Physical and mechanical properties (small parts, sharp edges, etc.)

Chemical limits (lead, phthalates, etc.)

Flammability testing

Label compliance (age warnings, tracking information, etc.)

2. Example of Testing Items

| Test Category | Example of Specific Content

| Physical Testing | Choking Risk of Small Parts, Tensile Strength

| Chemical Testing | Lead Content ≤100ppm, Phthalate ≤0.1%

| Label Inspection | Permanent Labeling, Integrity of Warning Statements

II. Processing Procedure (5 Steps)

1. Selecting a Certification Body

Testing must be conducted by a CPSC-accredited laboratory (e.g., Dezewei Testing CNAS Registration No.: L8083). Some domestic laboratories have cooperative qualifications.

2. Sample Preparation

Provide 3-5 unopened samples, ensuring they are consistent with the product sold.

3. Submitting Documents

Product manual, material list (e.g., plastic type), manufacturer information.

4. Testing and Report Generation

Typically takes 5-7 working days; expedited processing can be shortened to 3 days (additional cost).

5. Upload to Amazon

The report must include:

Product Name/Model

Testing Standard (ASTM F963-17)

Laboratory Information and Signature

III. Common Issues and Avoidance Guidelines

Cost: Approximately 500-2000 RMB, depending on the complexity of the testing items.

Validity: No fixed expiration date, but retesting is required if materials or design changes occur.

Reasons for Amazon Rejection:

The report does not reflect all applicable standards.

Laboratory accreditation is not recognized.

IV. Additional Suggestions

Advance Planning: Allow at least 2 weeks before peak season to avoid delays in listing.

Multilingual Labeling: If selling to multiple countries, EN71 (EU) and CCC (China) certifications can be obtained simultaneously.

Copyright © Shenzhen DTi Technology Testing Co., Ltd. All Rights Reserved Record number: 粤ICP备18006753号-2  Shen Gongwang Security: 44030602006947
13923722641

报价二维码

报价二维码