EU EN71 certification process for children's electric toys
Date:2026-03-23 10:18:48 Classification
:【question】 Visits:
EU EN71 certification process for children's electric toys
1、 Overview of Processing Flow
Confirm product scope → Prepare data samples → Select certification agency → Send samples for testing → Rectify retesting (if necessary) → Obtain certificate
2、 Detailed processing steps
|Step | Content | Description
| 1. Confirm the scope of testing | Determine the EN71 standard to be implemented | Electric toys should focus on EN71-1 (mechanical and physical properties including electrical safety), EN71-2 (combustion performance), EN71-3 (heavy metal migration)
| 2. Prepare sample materials | Provide product samples, technical documents | Sample quantity, instruction manual, material list, circuit diagram, etc
| 3. Choose a certification body | Entrust a qualified laboratory | It is recommended to choose a CNAS accredited laboratory (Dezewei Testing CNAS registration number: L8083)
| 4. Sample testing | Laboratory testing | Cycle usually 5-7 working days
| 5. Rectification and retesting | If there are any non-conforming items, they need to be rectified | Adjust the product design or materials and resubmit for inspection
| 6. Obtain certificate | Issue EN71 test report/certificate | Used for customs clearance, e-commerce platform sales, etc
3、 Additional attention items for electric toys
|Test focus | Specific content
|Electrical Safety | Voltage, Current, Temperature Rise, Overcharge Protection
|Battery safety | Lithium batteries/button batteries must meet relevant requirements
|Electromagnetic compatibility | It is recommended to evaluate EMC directive compliance at the same time
4、 Required documents for processing
Product samples (2-3 pieces)
Product Manual
Material Composition List
Circuit schematic diagram (if any)
Application Form
5、 Cycle and Cost
|Project | Reference Scope
|Regular cycle | 5-7 working days
|Cost | Depending on the complexity of the testing items and sample materials