What are the items of REACH test in the EU?
Date:2023-03-03 10:09:11 Classification
:【question】 Visits:
If your products are exported to the European Union and other countries, you should pay attention to the safety and environmental protection of materials. If you export to EU countries, the REACH test will make your products very competitive. So what are the items of the REAHC test.
At present, SVHC, a substance of high concern in REACH detection regulations, has been published in succession, and now there are 197 substances in total. For organic products, a full set of 197 items need to be tested during REACH testing. If it is an inorganic product, 71 items need to be tested.
The following products need REACH test, and other tests can be done for these products
1、 The test items that manufacturers and traders of leather, footwear, clothing and textile products often encounter are: AZO (azo compound), REACH, ROHS, o-benzene, DMF (dimethyl fumarate), eight heavy metals, Taobao quality inspection report, chroma, bisphenol, formaldehyde, total lead, PAHS, wear resistance test, tensile test, strength test, flame retardant test, appearance quality, identification label, UV aging resistance, breathability and moisture permeability, etc;
2、 The test items frequently encountered by manufacturers and traders of hardware zipper accessories for toy accessories and handicrafts include EN71, GB6675, ASTM F963, CPSIA, REACH, ROHS, o-benzene, formaldehyde, UV aging resistance test, CE certification, CCC certification, etc;
3、 The test items that plastic, plastic, ink and pigment manufacturers and traders often encounter include REACH, ROHS6, phthalate, halogen, MSDS, PAHS, DMF (dimethyl fumarate), eight heavy metal mold modification, total lead test, etc;
4、 Hardware tools, electronic appliances, LED energy-saving lamps and small machinery often encounter test items such as CE, FCC, CB, UL, GS, CCC, SASO, SONCAP, C-TICK, PSE, KC, SAA, etc;
What is the REACH test handling process?
Step 1: Apply
The applicant fills in the application form and provides the list of product components
Step 2: Quotation
Yibo engineers determine the test cost according to the materials provided
Step 3: Test
After confirming the quotation, the applicant shall sign the filing application form and service agreement, pay the full project fee, and prepare the test samples; (The specific number of test samples shall be connected with the staff).
Step 4: Issue the report
Pass the 5-7 working days cycle test (expedited), complete the report, complete the project, and issue the REACH test report;