05
2025.03
The testing process and key information for the German LFGB certification of food processing appliances are sorted out to confirm the product scope: including electric kettles, toasters, blenders and other appliances with food contact parts.
Smart children's toys in the Chinese market must comply with the GB6675 standard testing project requirements, cycle and certification: the testing cycle is usually 5-7 days, and a CNAS/CMA certification report can be obtained after passing.
Metal composition analysis and testing process, composition analysis: use spectral analysis (XRF, ICP-MS), mass spectrometry and other technologies to determine the type and content of elements.
04
EU CLP-PCN-UFI registration involves the management and notification of safety information of mixtures, and some problems are often encountered during the registration process.
As a type of electronic and electrical equipment, electric fans need to undergo RoHS testing before being exported to the EU market to ensure that they comply with EU environmental regulations and avoid damage to human health and the environment.
When children's inflatable toys are sold on the Amazon platform, CPC testing is required to ensure that the products meet relevant safety and quality standards.
03
Crystal jewelry exported to the EU must comply with REACH regulations (Registration, Evaluation, Authorization and Restriction of Chemical Substances). When choosing a certification body, give priority to EU-approved laboratories (such as Dezewei Testing)
The lubricant MSDS (Material Safety Data Sheet) report is a chemical safety technical specification that involves product safety information and compliance certification.
The EU EN71-1 test for plastic building blocks tables includes drop tests, small parts tests, sharp edge tests, tension/compression/torque tests, etc. to ensure structural stability and no safety hazards.
28
2025.02
For French DGCCRF testing of food packaging materials, priority is given to laboratories with CNAS/CMA qualifications (such as Shenzhen Dezewei Testing). The regular cycle is 5-7 days and the expedited cycle is 3-5 days.
报价二维码