Plastic puzzle EU EN71 certification report process
Date:2026-04-17 10:35:25 Classification
:【question】 Visits:
Plastic puzzle EU EN71 certification report process
1、 Product Overview and Certification Background
Plastic puzzles, as children's educational toys, must comply with EN71 toy safety standards when exported to the EU market. EN71 is a mandatory certification system in the European Union, and all toy products sold in the EU must pass corresponding tests and obtain qualified reports, otherwise they will face risks such as customs seizure, product recall, and administrative penalties.
2、 EN71 certification core testing items
Plastic puzzles usually require the following three basic tests:
|Test items | Testing content | Limited requirements
|EN71-1 | Mechanical and physical properties (small parts, sharp edges, sharp points, projectiles, etc.) | There shall be no risk of suffocation or injury
|EN71-2 | Combustion Performance Test | Flame Spread Speed ≤ 30mm/s
|EN71-3 | Specific element migration (19 items including lead, cadmium, mercury, arsenic, barium, chromium, etc.) | Different limit values depending on material type
Note: Plastic puzzles still need to be evaluated for the need for EN71-9 organic compound testing based on the actual situation.
3、 Handling process
Step 1: Preliminary Preparation
Prepare product technical documentation, including Bill of Materials (BOM), product specifications, structural diagrams, usage instructions, etc. Prepare 3-5 representative samples at the same time, and it is recommended to provide uniform material samples for accurate testing.
Step 2: Choose a testing institution
Entrust a third-party testing agency with CNAS and CMA accreditation qualifications. Domestic institutions such as Dezewei Testing CNAS registration number: L8083
Step 3: Submit Application and Sample Submission
Fill out the EN71 testing commission application form, specify the testing items to be applied for (it is recommended to choose all EN71-1/2/3 items), and send the samples to the testing institution.
Step 4: Laboratory testing
The testing agency conducts testing according to standard methods such as IEC 62321:
Physical and mechanical testing (simulating children's usage scenarios)
Combustion test (horizontal combustion method)
Heavy metal migration test (XRF initial screening+ICP confirmation)
Step 5: Report Preparation and Issuance
After the testing is completed, the institution issues an EN71 testing report, which includes testing data, judgment conclusions, and testing method instructions. The report can be used for customs clearance, sales, and platform entry.
4、 List of required materials
|Material type | Specific content
|Product Information | Product Name, Model, Material Description, Usage Description
|Technical documents | Bill of Materials (BOM), structural drawings, dimensional specifications
|Sample | 3-5 representative finished product samples
|Application Form | EN71 Testing Commission Application Form
|Enterprise Qualification | Business License (Copy)
5、 Key precautions
Regarding material splitting: Plastic puzzles are usually composed of multiple plastic materials. It is recommended to send samples separately according to different materials before inspection, in order to accurately locate non-conforming items and make targeted improvements.
Regarding age identification: EN71-6 requires product labeling to be applicable to age groups, and the suitability for children under 3 years old should be determined based on the size of the puzzle pieces. If small parts are included, they must be labeled as "not suitable for children under 36 months old".
Regarding supply chain control: Raw material suppliers are required to provide RoHS/EN71 compliance statements to ensure that plastic particles, pigments, and other raw materials themselves meet standard requirements.
Regarding the validity period of the report: EN71 reports do not have a fixed validity period, but retesting is required when there are changes in product design, materials, or suppliers. It is recommended to keep the testing report properly for at least 10 years.
6、 Processing cycle and cost reference
|Project | Reference Scope
|Testing cycle | 5-7 working days (normal); 3-5 working days (urgent)
|Testing fee | 1000-2000 yuan (full EN71-1/2/3)
|Certificate format | EN71 testing report (most common)